China Transmission Line Geological Disaster and Galloping Disaster Monitoring System - China Supplier China Transmission Line Geological Disaster and Galloping Disaster Monitoring System - China Supplier China Transmission Line Geological Disaster and Galloping Disaster Monitoring System - China Supplier China Transmission Line Geological Disaster and Galloping Disaster Monitoring System - China Supplier China Transmission Line Geological Disaster and Galloping Disaster Monitoring System - China Supplier

Transmission Line Geological Disaster and Galloping Disaster Monitoring System

¥50000
Instruments & Meters/Measurement Standards/Electromagnetic Metrology Standards


Contact Info
  • Building C-9, Floor C, Precision达 Industrial Park, No.39 Qingfeng Avenue, Longgang Sub-district, Longgang District, Shenzhen City, 518116
  • 李女士
  • 13682351635
  • 1920671927@qq.com

Product Alias: Conductor Galloping Monitoring System

Product Model: TLKS-PMG-WD

Transmission Line Geological Disaster and Galloping Disaster Monitoring System




1. Product Description:

China has a large number of transmission lines, with high altitudes, long spans and long distances. The meteorological conditions within transmission line corridors are complex and changeable, and conductor galloping accidents occur frequently. The causes of accidents include excessive conductor galloping amplitude, and the stability of the power supply system is not optimistic when facing the challenge of conductor galloping. It is often necessary to collect data for statistics to calculate the restoration of galloping trajectories, but since the tested data is not real-time, there is no way to accurately obtain real-time calculation results. The Transmission Line Geological Disaster and Galloping Disaster Monitoring System developed by our company collects real-time galloping data of transmission conductors. When the galloping frequency exceeds the preset value, an alarm will be automatically triggered, and line maintenance personnel can immediately take emergency measures to ensure the safe operation of high-voltage lines.




2. Working Principle:

The Transmission Line Geological Disaster and Galloping Disaster Monitoring System is equipped with a set of galloping sensors on the conductors. The system automatically obtains the acceleration values of the conductors in the vertical and horizontal directions during galloping, and digitally compresses and encodes the collected galloping, micro-meteorological and image data, then sends the data to the monitoring center. Through the data monitoring client, the on-site conditions of each monitoring point can be viewed in real time. Maintenance monitoring personnel analyze and compare the data such as galloping, micro-meteorology and images sent from the site. If abnormal early warning information appears, corresponding emergency measures will be taken immediately to ensure the safe operation of high-voltage lines.




3. Product Functions:

l Real-time monitoring of conductor displacement, acceleration, angle, etc., and combined with various sensor data for analysis and processing, data modeling, and timely diagnosis of abnormal information

l Equipped with micro-meteorological data collection function, by collecting temperature, humidity, wind speed, wind direction, etc. at the front end, combining them with conductor galloping data for analysis and processing

l Intelligent galloping analysis: establish three-dimensional parameters through the platform's three-dimensional analysis algorithm when the equipment is first installed, and based on the MATLAB algorithm, integrate sensor data and image data to form a three-dimensional monitoring system for the entire monitored line

l Real-time video browsing function, with resolution ≤1080P, which can realize the monitoring of conductor galloping conditions, and diagnose galloping information through image recognition processing

l Stable and reliable battery charging management system, using MPPT (Maximum Power Point Tracking) technology to charge the battery, which can increase the solar charging efficiency by at least 20%




4. Technical Parameters:

u Power supply method: wind-solar hybrid plus battery

u Communication requirements: support wireless network communication, and operators can be selected according to on-site conditions

u Working voltage: DC12V




5. Summary:

It is very necessary to install a set of Transmission Line Geological Disaster and Galloping Disaster Monitoring System on the transmission line to monitor the status of the transmission tower power system in real time online. It reminds operation and maintenance personnel to take effective protection measures in time to reduce the damage of galloping to the conductors, which helps the staff to grasp various conditions of the transmission tower at the first time, greatly reduces the cost of manual inspection, and is more practical and reliable. The TLKS-PMG-WD Transmission Line Geological Disaster and Galloping Disaster Monitoring System online monitoring device developed by our company has been applied in many provinces, and has participated in provincial tenders, etc. Our company has set up offices all over the country to carry out business. Welcome to consult or act as an agent, Ms. Li from Shenzhen Teluck Technology Co., Ltd.

①③⑥⑧②③⑤①⑥③⑤ (WeChat synchronized)    QQ: ①⑨②0⑥⑦①⑨②⑦     Company website: //www.sztlk.com

Customized products, the quoted price is the reference range price when the market is currently released, and the actual price is subject to negotiation.




6. Precautions:

1. Pay attention to avoiding the equipment from falling to the ground or being subjected to strong impact from other objects;

2. Pay attention to avoiding the solar panel from being subjected to strong external impact, which may cause damage to the solar panel;

3. When installing, try to make the solar panel face the direction of sunlight;

4. When installing the equipment, turn off the power switch, and turn on the power switch after the installation is completed;

5. It is strictly forbidden to disassemble the structure or circuit board without permission. Unauthorized disassembly of the equipment will void the warranty.

Instruments & Meters/Measurement Standards/Electromagnetic Metrology Standards
About Toocle.com -  Toocle Partnership -  Toocle Services -  Toocle Agents
Copyright © Toocle.com. All Rights Reserved.
(浙)-经营性-2023-0192
ChatGlobal TChat