China Intelligent spray painting robot - China Supplier
China Intelligent spray painting robot - China Supplier China Intelligent spray painting robot - China Supplier China Intelligent spray painting robot - China Supplier China Intelligent spray painting robot - China Supplier China Intelligent spray painting robot - China Supplier

Intelligent spray painting robot

¥888
Machinery & Equipment/Fans & Ventilation Equipment/Fan Coil Units


Contact Info
  • No.3099 Chang'an Road, East Taihu Lake Ecotourism Resort (Taihu New Town), 215200
  • 何彦武
  • 13157670256
  • jiersrobot@163.com

                                                           JERRYS Intelligent Spray Robot System Process Flow

                                                                        JERRYS ROBOT

Requirements for pre-treatment process:

1. Input products: Place the objects to be coated on the inserts to start the work.

2. Electrostatic dust removal: Remove the oil and dust brought during injection molding.

3. Preheating: Provide a certain temperature to the objects to be coated for better color application.

4. Primer spraying: Cover the original color of the plastic, and spray the base color first according to the production requirements.

5. Drying: Through the temperature in the IR zone of the tunnel, achieve a semi-dry state to prepare for the next spraying process.

6. Surface spraying: Spray the required color.

7. Leveling and drying: Level and dry through the tunnel.

8. UV spray curing: Combine with UV coating and use the required light energy (800~1200mj) from UV 365nm light to achieve instant curing.

9. Shipment and inspection & packaging. The coating production line process is divided into: pre-treatment, powder coating, and heat curing.



Plastic Parts Topcoat Line - Coating Process (Main Line 3C1B)

Serial No.

Process Name

Treatment Method

Treatment Time

Temperature

Humidity

Remarks

1

Loading

Manual

RT

2

Electrostatic Dust Removal

Manual

3.0m

18-28℃

60±5%

3

Special Primer Spraying

Manual

3.0m

18-28℃

60±5%

4

Primer (Intermediate Coating) Spraying

2 Robots + Manual Touch-Up

10m

18-28℃

60±5%

6

Leveling

Infrared Heating

8min

50-60℃

60±5%

Reserved for water-based drying

7

Cooling

/

4min

18-28℃

60±5%

8

Color Paint Spraying

4 Robots + Manual Touch-Up

10m

18-28℃

60±5%

10

Leveling

Infrared Heating

8min

50-60℃

60±5%

Reserved for water-based drying

11

Cooling

/

4min

18-28℃

60±5%

12

Clear Coat Spraying

4 Robots + Manual Touch-Up

10m

18-28℃

60±5%

13

Leveling

/

8min

18-28℃

60±5%

14

Curing Baking

Hot Air Circulation

90min

75℃±5

Thermal Radiation

15

Cooling

Forced

8min

RT

16

Unloading

Manual

/

RT

Machinery & Equipment/Fans & Ventilation Equipment/Fan Coil Units
About Toocle.com -  Toocle Partnership -  Toocle Services -  Toocle Agents
Copyright © Toocle.com. All Rights Reserved.
(浙)-经营性-2023-0192
ChatGlobal TChat