Intelligent spray painting robot
Contact Info
- No.3099 Chang'an Road, East Taihu Lake Ecotourism Resort (Taihu New Town), 215200
- 何彦武
- 13157670256
- jiersrobot@163.com
JERRYS Intelligent Spray Robot System Process Flow JERRYS ROBOT Requirements for pre-treatment process: 1. Input products: Place the objects to be coated on the inserts to start the work. 2. Electrostatic dust removal: Remove the oil and dust brought during injection molding. 3. Preheating: Provide a certain temperature to the objects to be coated for better color application. 4. Primer spraying: Cover the original color of the plastic, and spray the base color first according to the production requirements. 5. Drying: Through the temperature in the IR zone of the tunnel, achieve a semi-dry state to prepare for the next spraying process. 6. Surface spraying: Spray the required color. 7. Leveling and drying: Level and dry through the tunnel. 8. UV spray curing: Combine with UV coating and use the required light energy (800~1200mj) from UV 365nm light to achieve instant curing. 9. Shipment and inspection & packaging. The coating production line process is divided into: pre-treatment, powder coating, and heat curing.
Plastic Parts Topcoat Line - Coating Process (Main Line 3C1B) | ||||||
Serial No. | Process Name | Treatment Method | Treatment Time | Temperature | Humidity | Remarks |
1 | Loading | Manual | RT | |||
2 | Electrostatic Dust Removal | Manual | 3.0m | 18-28℃ | 60±5% | |
3 | Special Primer Spraying | Manual | 3.0m | 18-28℃ | 60±5% | |
4 | Primer (Intermediate Coating) Spraying | 2 Robots + Manual Touch-Up | 10m | 18-28℃ | 60±5% | |
6 | Leveling | Infrared Heating | 8min | 50-60℃ | 60±5% | Reserved for water-based drying |
7 | Cooling | / | 4min | 18-28℃ | 60±5% | |
8 | Color Paint Spraying | 4 Robots + Manual Touch-Up | 10m | 18-28℃ | 60±5% | |
10 | Leveling | Infrared Heating | 8min | 50-60℃ | 60±5% | Reserved for water-based drying |
11 | Cooling | / | 4min | 18-28℃ | 60±5% | |
12 | Clear Coat Spraying | 4 Robots + Manual Touch-Up | 10m | 18-28℃ | 60±5% | |
13 | Leveling | / | 8min | 18-28℃ | 60±5% | |
14 | Curing Baking | Hot Air Circulation | 90min | 75℃±5 | Thermal Radiation | |
15 | Cooling | Forced | 8min | RT | ||
16 | Unloading | Manual | / | RT | ||