Long-term success of drainage tubes relies on quality.
Contact Info
- Add:河南省鹤壁市鹤山区南路, Zip: 458010
- Contact: 康经理
- Tel:15939291020
- Email:1791280230@qq.com
Other Products
The long-term success of a diversion pipe relies on quality, and the longevity of a brand depends not on flashy marketing but on integrity. The usability of a product is not determined by low cost but by quality, and your quality is actually determined by your vision.
Purpose of Diversion Pipe
A diversion pipe, also known as a quick connector for a comprehensive gas extraction parameter measuring instrument, is primarily used in conjunction with such instruments. It includes a main body, a gas measurement hole, a dust filter screen, etc. The main body is tubular.
Diversion Pipe Parameters and Specifications
Inner diameter φ25 (1 inch) Dimensions: Length 190MM Interface inner diameter 25MM, outer diameter 30MM
Inner diameter φ50 (2 inch) Dimensions: Length 380MM Interface inner diameter 46MM, outer diameter 54MM. Middle inner diameter 50MM Horse tooth 63mm
How to Use the Diversion Pipe
1. Before descending into the mine, ensure the product is fully charged to avoid inconvenience during measurement due to insufficient battery.
2. Handle the product gently and avoid strong impacts, paying special attention to preventing collisions with the filter.
3. Turn on the device before arriving at the site and turn it off after leaving.
4. Allow the product to warm up for more than 30 minutes before starting normal measurements.
5. When connecting the diversion pipe, wait for the airflow inside the pipeline to stabilize, then attach the handle to the diversion pipe. Confirm everything is correct before measuring.
6. Before placing the slot into the diversion pipe, ensure the product is in measurement mode, meaning the pump is activated.
7. Before measuring, confirm there is no water inside the pipeline.
8. During measurement, ensure the range used matches that of the pipeline.
9. Confirm that the handle and the diversion pipe or insertion-type引流管 are in good contact without air leakage.
10. When installing the insertion-type引流管, ensure the windward direction is correct.
11. The insertion depth of the windward port of the insertion-type引流管 should ideally be within the middle third of the diversion pipe.
12. When the instrument is first turned on and begins measuring, it will prompt for "air pressure balance."
| Industry Category | Machinery |
|---|---|
| Product Category | |
| Brand: | 博达机械 |
| Spec: | DN50 |
| Stock: | 890 |
| Manufacturer: | |
| Origin: | China / Henan / Hebishi |