C70/80/90 Prestressed Concrete Bridge Plastic Corrugated Pipe for Precast Beams, Direct Sales from Corrugated Pipe Manufacturer
Price:元4
Contact Info
- Add:河北衡水北方工业基地园区东路269号, Zip: 053000
- Contact: 高晴
- Tel:15297607517
- Email:1518498187@qq.com
Other Products
Description
Additional Information
C70/80/90 Prestressed Concrete Bridge Plastic Corrugated Pipe for Precast Beams - Direct Factory Sales
I. Product Introduction
Prestressed Plastic Corrugated Pipe with Bamboo Joint Pattern is a high-performance corrugated pipe used for post-tensioned prestressed concrete structures, typically made from high-density polyethylene (HDPE) or polypropylene (PP), featuring a bamboo joint-like raised surface structure. Its core characteristics are as follows:
1. Product Features
- Strong Corrosion Resistance: Plastic material resists acids, alkalis, and rust, C70/80/90 Prestressed Concrete Bridge Plastic Corrugated Pipe for Precast Beams - Direct Factory Sales suitable for humid or corrosive environments.
- Low Friction Coefficient: Smooth inner wall reduces friction loss during prestressed tendon tensioning.
- Good Flexibility: Can be bent into various curves to adapt to complex structural construction.
- High Compressive Strength: Bamboo joint design enhances ring stiffness, resisting impact during concrete pouring.
- Excellent Sealing: Prevents cement grout infiltration, C70/80/90 Prestressed Concrete Bridge Plastic Corrugated Pipe for Precast Beams - Direct Factory Sales ensuring dense grouting in ducts.
2. Application Scenarios
- Bridge engineering (box girders, T-beams, etc.)
- Building structures (long-span floors, stadiums, etc.)
- Municipal engineering (underg utility tunnels, viaducts, etc.)
3. Common Specifications
- Diameter: Φ40mm, Φ50mm, Φ60mm, Φ80mm, etc. C70/80/90 Prestressed Concrete Bridge Plastic Corrugated Pipe for Precast Beams - Direct Factory Sales (selected based on prestressed tendon specifications).
- Length: Typically 6m per piece, customizable.
- Color: Black, blue, etc. (some manufacturers provide color codes to distinguish models).
II. Construction Process
1. Pre-Construction Preparation
- Material Inspection: Ensure pipes are free from damage, deformation, and have intact bamboo joint structures.
- Layout and Marking: Mark the prestressed tendon alignment according to design drawings, fixing support bar spacing (recommended ≤1m).
2. Installation Key Points
- Fixing Methods:
- Use binding wires or specialized clips to secure the bamboo joint pipe to support bars, ensuring smoothness and no local bending.
- Use specialized sleeves or heat fusion for connections, and seal with tape to prevent grout leakage.
- Precautions:
- Avoid direct welding to prevent high-temperature damage to the pipe.
- Bending radius must comply with standards (generally ≥3m) to prevent sharp angles.
3. Concrete Pouring
- Avoid vibrating near the corrugated pipe to prevent displacement or damage.
- Check duct畅通 after pouring (can be tested with a duct detector).
4. Prestressing Tensioning and Grouting
- Before Tensioning: Clear debris from the duct, insert steel strands or bars.
- Grouting Requirements:
- Use specialized grouting material with water-cement ratio ≤0.4.
- Inject from the low end, vent from the high end, ensuring full grouting.
| Industry Category | Construction-Real-Estate |
|---|---|
| Product Category | |
| Brand: | 衡水长江预应力 |
| Spec: | 70 |
| Stock: | |
| Origin: | China / Hebei / Hengshuishi |