Bridge Rotation Spherical Hinge 4m 14500 Ton Road-Railway Overpass Project Spherical Hinge Processing and Construction

Price:Negotiable
Industry Category: Home Appliances
Product Category:
Brand: 衡水长江预应力
Spec: 14500吨


Contact Info
  • Add:河北衡水北方工业基地园区东路269号, Zip: 053000
  • Contact: 高晴
  • Tel:15297607517
  • Email:1518498187@qq.com

Other Products

Description
Additional Information

Bridge Rotation Spherical Hinge 4m 14500 Ton Road-Railway Overpass Project Spherical Hinge Processing and Construction

  1. Pre-construction Preparation:

    • Design Review: Verify the dimensions, load-bearing capacity, installation position, and other parameters of the spherical hinge according to the design drawings to ensure compliance with design requirements.
    • Material Inspection: Check the appearance quality of the spherical hinge, sliding materials, traction equipment, etc., to ensure there are no defects such as cracks, deformation, or corrosion.
    • Foundation Treatment: Clean the installation foundation of the spherical hinge, Bridge Rotation Spherical Hinge 4m 14500 Ton Road-Railway Overpass Project Spherical Hinge Processing and Construction

      ensuring the foundation surface is flat, clean, and free of debris and oil stains.
  2. Spherical Hinge Installation:

    • Lower Spherical Hinge Installation: Precisely install the lower spherical hinge at the designated position, Bridge Rotation Spherical Hinge 4m 14500 Ton Road-Railway Overpass Project Spherical Hinge Processing and Construction

      use a level to adjust its horizontality, ensuring the error is within the allowable range.
    • Sliding Material Laying: Lay sliding materials (e.g., PTFE plates) on the surface of the lower spherical hinge, ensuring they are flat and free of wrinkles.
    • Upper Spherical Hinge Installation: Install the upper spherical hinge on the lower one, ensuring the central axes of both hinges are aligned, with the error controlled within the design tolerance.
    • Temporary Fixation: After installation, temporarily fix the upper spherical hinge, Bridge Rotation Spherical Hinge 4m 14500 Ton Road-Railway Overpass Project Spherical Hinge Processing and Construction

      to prevent displacement during subsequent construction.
  3. Traction System Installation:

    • Traction Equipment Layout: Symmetrically arrange traction equipment (e.g., jacks, steel strands) on both sides of the bridge to ensure even distribution of traction force.
    • Reaction Seat Installation: Install reaction seats to ensure the traction system's reaction force is effectively transmitted to the substructure.
    • Traction System Debugging: Debug the traction system to ensure smooth and synchronized operation.
  4. Rotation Construction:

    • Trial Rotation: Perform a trial rotation before the formal rotation to check the rotational performance of the spherical hinge, synchronization of the traction system, and stability of the bridge.
    • Formal Rotation: Activate the traction system to slowly and steadily rotate the bridge to the design position. Monitor the bridge's posture and the spherical hinge's status in real-time during rotation.
    • Precise Positioning: When the bridge is close to the design position, use fine-tuning devices for precise positioning to ensure the error is within the allowable range.
  5. Post-construction Inspection:

    • Spherical Hinge Status Check: After rotation, inspect the spherical hinge for abnormal deformation, wear, or damage.
    • Bridge Position Acceptance: Measure the final position of the bridge to ensure it meets design requirements.
    • Bridge Fixation: After the bridge is in place, permanently fix it to ensure stability.

III. Precautions

  1. Precise Installation: The installation accuracy of the spherical hinge directly affects the success of the bridge rotation. Installation errors must be strictly controlled.
  2. Sliding Material Protection: Avoid contamination or damage to sliding materials (e.g., PTFE plates) during construction to ensure smooth rotation.
  3. Monitor Rotation Process: Continuously monitor the bridge's posture, rotation speed, and synchronization of the traction system during rotation to prevent accidents.
  4. Environmental Factors: Avoid rotation construction under adverse weather conditions such as strong winds, rain, or snow to ensure safety.

IV. Common Issues and Solutions

  1. Unsteady Rotation: This may be due to uneven laying of sliding materials or lack of synchronization in the traction system. Bridge Rotation Spherical Hinge 4m 14500 Ton Road-Railway Overpass Project Spherical Hinge Processing and Construction

    Inspect and adjust the sliding materials and traction system.
  2. Spherical Hinge Jamming: This may be caused by damaged sliding materials or impurities entering the hinge. Clean the hinge and replace the sliding materials.
  3. Bridge Deviation: If the bridge deviates during rotation, it may be due to uneven traction force or inadequate monitoring. Adjust the traction force promptly and enhance monitoring.


Industry Category Home Appliances
Product Category
Brand: 衡水长江预应力
Spec: 14500吨
Stock:
Origin: China / Hebei / Hengshuishi