China Room Temperature Blackening and Bluing Solution for Steel - China Supplier
China Room Temperature Blackening and Bluing Solution for Steel - China Supplier China Room Temperature Blackening and Bluing Solution for Steel - China Supplier China Room Temperature Blackening and Bluing Solution for Steel - China Supplier China Room Temperature Blackening and Bluing Solution for Steel - China Supplier China Room Temperature Blackening and Bluing Solution for Steel - China Supplier

Room Temperature Blackening and Bluing Solution for Steel

Price:元16 /千克
Industry Category: Chemicals
Product Category:
Brand: 知行
Spec: ZX-311


Contact Info
  • Add:菏泽市牡丹区双河路东段南侧182号, Zip: 274900
  • Contact: 刘琦
  • Tel:0530-5585186
  • Email:297360640@qq.com

Other Products

Description
Additional Information

ZX-311 Room Temperature Blackening Solution for Steel

Room temperature rapid blackening of steel is a manufacturing technology currently being promoted. Its characteristics include overcoming the three major challenges of traditional blackening (bluing) processes: high energy consumption, low efficiency, and environmental pollution. It is suitable for various steel grades, such as silicon steel, cast iron, low-carbon steel, etc.

I. Process Characteristics:

1. Operates at room temperature, eliminating the need for complex heating equipment, resulting in significant energy savings;

2. Improves work efficiency, allows flexible production batches, and meets production requirements at any time;

3. Enhances corrosion resistance compared to older blackening processes, produces no harmful gases, and is more environmentally friendly.

II. Main Technical Indicators: Solution appearance: Light green concentrated liquid. pH value: 2–2.5. Operating temperature: 5–40°C. Processing time: 30 minutes, with the workpiece exposed to air for 1–2 minutes every ten minutes. Finally, rinse three times with clean water.

III. Maintenance and Management: Every 10 minutes during the blackening process, shake the workpiece up and down several times to ensure full contact with the blackening solution. The blackening time is 10 minutes. Mastering the blackening time is key to obtaining a high-quality black film. Different materials and different solution concentrations require varying blackening times. The criterion for judgment: a uniform black film should appear on the workpiece surface. Surface drying takes 2–4 hours, and full drying takes 24 hours to achieve the desired effect. The residual solution on the surface can be fully utilized to reduce the consumption of blackening solution and lower costs. After blackening, rinse three times with clean water.

IV. Each barrel has a net weight of 25 kg and can be diluted 1:2. Each kilogram can blacken an area of approximately 20–30 square meters.

Industry Category Chemicals
Product Category
Brand: 知行
Spec: ZX-311
Stock: 1000
Manufacturer:
Origin: China / Shandong / Hezeshi
About Toocle.com - Partner Programme - Old Version
Copyright © Toocle.com. All Rights Reserved.
(浙)-经营性-2023-0192