Grid-connected Photovoltaic Power Station for Industrial and Commercial Carports with Tile Photovoltaic Generation - EPC Turnkey Project
Contact Info
- Add:南京市栖霞区八卦洲街道中心路68号, Zip: 210043
- Contact: 小芒
- Tel:15951634545
- Email:15951634545@163.com
Other Products
Electric Energy Metering
General Requirements for Electric Energy Metering
Photovoltaic power station Before connecting to the grid, the metering points for on-grid electricity and grid-consumed electricity should be clearly defined. In principle, the metering point should be set at the grid connection point of the photovoltaic power station at the boundary of property rights.
Each metering point should be equipped with an electric energy metering device, with equipment configuration and technical requirements complying with DL/T448 "Technical Management Regulations for Electric Energy Metering Devices," as well as relevant standards and regulatory requirements.
Electric energy meters should use static multifunctional meters, with technical performance meeting the requirements of GB/T 17883 "Class 0.2S and 0.5S Static AC Active Energy Meters" and DL/T641 "Multifunctional Electric Energy Meters." The electric energy meter should at least have bidirectional active and four-quadrant reactive metering functions, event recording function, be equipped with a standard communication interface, and have the capability for local communication and remote communication via an electric energy information acquisition terminal. The communication protocol of the electric energy meter should comply with DL/T645 "Multifunctional Electric Energy Meter Communication Protocol." The collected information should be connected to the electric energy information acquisition system of the grid dispatch organization.
For medium-sized photovoltaic power stations, the same metering point should be equipped with one set each of main and secondary electric energy meters of the same model, specifications, and accuracy. The main and secondary meters should be clearly marked.
The electric energy metering device should be installed by the property owner of the photovoltaic power station before grid connection, in accordance with requirements, and undergo channel, protocol, and system debugging in conjunction with the electric energy information acquisition terminal and the master station system. A mutually recognized, qualified electric energy metering testing institution should complete relevant tests on the electric energy metering device, issue a complete test report, and apply seals, stamps, or other securing measures. Before the electric energy metering device is put into operation, a joint completion acceptance inspection should be conducted by the grid company and the property owner of the photovoltaic power station.
Jiangsu Mangzhong Construction Co., Ltd. is a comprehensive energy service provider focused on the photovoltaic field, dedicated to being a smart energy enterprise engaged in photovoltaic power station investment, development, design, construction, intelligent operation and maintenance, professional consulting services, and photovoltaic power station equipment recycling.
Company Name: Jiangsu Mangzhong Construction Co., Ltd.
Business Scope: Photovoltaic power station EPC and solar power station investment
Company Landline: 025-5888 3737
Mobile Number: 159 5163 4545
Company Website: http://www.mangz.cn
| Industry Category | Energy |
|---|---|
| Product Category | |
| Brand: | 芒种 |
| Spec: | PV |
| Stock: | 10000 |
| Manufacturer: | |
| Origin: | China / Jiangsu / Nanjingshi |