Liaoning ISO 50430 Certification Preparation Materials Certification Agency
Contact Info
- Add:辽宁省沈阳市和平区和平北大街, Zip: 110001
- Contact: 孙女士
- Tel:18834158001
- Email:2480637185@qq.com
Other Products
Certification Preparation:
1. Proof materials demonstrating the applicant organization's independent legal status (e.g., valid business license with annual inspection, organization code certificate), valid licenses, qualification certificates, etc. (copies).
2. Production process flowchart/work process diagram or working principle diagram.
3. Brief introduction of the product applying for certification (including technical, production volume, purpose, quality, sales, and other information), product standard list and names, and laws and regulations related to the product/process.
Completed Projects: 1. Bid Winning Notice 2. Construction Contract 3. Construction Organization Design 4. Special Construction Plan 5. Inspection Batch, Subdivision and Section Acceptance Records 6. Project Completion Acceptance Certificate 7. Quality, Environment, and Civilized Construction Inspection Records (Engineering Department)...
Ongoing Projects: 1. Bid Winning Notice 2. Construction Contract 3. Construction Organization Design, Submission for Review, Approval 4. Special Construction Plan 5. Contract Disclosure, Contract Review Records 6. Technical Disclosure, Safety Disclosure Records 7. Personnel and Qualification Submission for Verification (Team Personnel: Project Manager Constructor, Certificate B, Technical Responsible Person, Eight Major Certificates... Special Work Operation Certificates...) 8. Three-Level Safety Education 9. Drawing Review 10. Material Submission for Verification (Material Procurement List, Qualified Supplier List, Material Acceptance Records, Issuance and Receipt Records, Material Certificates, Inspection Reports, Third-Party Inspection Reports...) 11. Equipment/Construction Machinery List (Generators, Distribution Boxes, Welding Machines, Hot Melt Machines, Small Construction Tools...), Equipment/Machinery Submission for Verification, Special Equipment Submission for Verification (Cranes, Excavators...), Special Equipment Operation Licenses, Equipment Maintenance Records... 12. Outsourcing: Labor Agreements, Lease Agreements... 13. Construction Logs 14. Construction Processes, Construction Techniques, Control Requirements, Construction and Acceptance Standards, National Standards, Industry Norms (Quality, Environment, Safety)... 15. Measuring Instruments (Total Station, Theodolite, Steel Tape, Ground Resistance...) Calibration Certificates 16. Key Processes/Special Processes, Requiring Process Confirmation Records 17. Special Construction Plan Control Requirements, Control Records 18. Project Change, Negotiation Records 19. Hidden Works, Inspection Batch, Division Works, Subitem Works Acceptance Records 20. Project Quality Inspection Records (Self-Inspection) 21. Daily Inspection Records by Supervision and Construction Units 22. Supervision Notices, Rectification Replies 23. Engineering Department's Inspection Records of Project Construction Quality 24. Project Management Target Assessment (Quality, Environment, Civilized Construction, Progress...) 25. Environment, Civilized Construction Special Plans... 26. Waste Removal Agreements, Wastewater Discharge, Earthwork Transport Control, etc. 27. Personnel Physical Examinations, Occupational Disease Examinations, Social Insurance (Work Injury Insurance...) 28. Three-Level Safety Education Cards 29. Project Department Self-Inspection (Environment, Civilized Construction) 30. Engineering Department Inspection (Environment, Civilized Construction) 31. Labor Protection Supplies Issuance Records 32. Project Emergency Plans 33. Emergency Drill Records... On-site Focus: On-site Signs, Five Plates and One Diagram, Safety Protection, Firefighting Facilities, Personnel Protection, Quality Control, Environmental Control, Safety Control Status...
Certification Process:
1. The enterprise signs a consulting contract with us and submits a written application for acceptance;
2. Collect the enterprise's existing management documents, technical documents, and national standards for review;
3. We arrange for consulting teachers to organize on-site establishment and writing of system documents;
4. Repeated revision of documents to ensure consistency with the actual situation of the enterprise, operability, and executability;
5. Schedule industry expert review time for technical documents;
6. Guide office and construction site rectification before on-site audit;
7. Audit teachers conduct on-site audit;
8. We assist the enterprise in rectifying non-conforming items during the first stage on-site audit;
9. We assist the enterprise in the second stage on-site audit, rectifying non-conforming items;
10. After passing the audit, await certification issuance and public announcement.
Certification Process and Cycle: The processing cycle for GB/T50430 is approximately 2 months; some qualified enterprises may apply for expedited processing.
Local Certification Agency: Ms. Sun 18834158001
| Industry Category | Business-Services |
|---|---|
| Product Category | |
| Brand: | |
| Spec: | |
| Stock: | 999 |
| Manufacturer: | |
| Origin: | China / Liaoning / Shenyangshi |