China Transmission Line Geological Disaster and Galloping Disaster Monitoring System - China Supplier
China Transmission Line Geological Disaster and Galloping Disaster Monitoring System - China Supplier China Transmission Line Geological Disaster and Galloping Disaster Monitoring System - China Supplier China Transmission Line Geological Disaster and Galloping Disaster Monitoring System - China Supplier China Transmission Line Geological Disaster and Galloping Disaster Monitoring System - China Supplier China Transmission Line Geological Disaster and Galloping Disaster Monitoring System - China Supplier

Transmission Line Geological Disaster and Galloping Disaster Monitoring System

Price: ¥50000
Industry Category: Instruments & Meters/Measurement Standards/Electromagnetic Metrology Standards
Product Category:
Brand: 特力康
Spec: TLKS-PMG-WD


Contact Info
  • Add:C-9/F, Building C, Jingda Industrial Park, No. 39 Qingfeng Avenue, Longgang Street, Longgang District, Shenzhen, Zip: 518116
  • Contact: 李女士
  • Tel:13682351635
  • Email:1920671927@qq.com

Other Products

Description
Additional Information

Product Alias: Conductor Galloping Monitoring System

Product Model: TLKS-PMG-WD

Transmission Line Geological Disaster and Galloping Disaster Monitoring System




1. Product Description:

China has a large number of transmission lines, with high altitudes, long spans and long distances. The meteorological conditions within the transmission line corridors are complex and changeable, and conductor galloping accidents occur frequently. The causes of accidents include excessive conductor galloping amplitude, and the stability of the power supply system is not optimistic under the challenge of conductor galloping. It is often necessary to collect data for statistics to calculate the restoration of galloping trajectories, but because the test data is not real-time, it is impossible to accurately obtain real-time calculation results. The Transmission Line Geological Disaster and Galloping Disaster Monitoring System developed by our company collects real-time galloping data of transmission conductors. When the galloping frequency exceeds the preset value, an alarm will be automatically triggered, and line maintenance personnel can immediately take emergency measures to ensure the safe operation of high-voltage lines.




2. Working Principle:

The Transmission Line Geological Disaster and Galloping Disaster Monitoring System is equipped with a set of galloping sensors on the conductor. The system automatically obtains the acceleration values of the conductor in the vertical and horizontal directions during galloping. It remotely collects galloping, micro-meteorological and image data, then digitally compresses and encodes the data, and sends it to the monitoring center. Through the data monitoring client, the on-site conditions of each monitoring point can be viewed in real time. Maintenance and monitoring personnel analyze and compare the data such as galloping, micro-meteorology and images sent from the site. If abnormal early warning information appears, corresponding emergency measures will be taken immediately to ensure the safe operation of high-voltage lines.




3. Product Functions:

l Real-time monitoring of conductor displacement, acceleration, angle, etc., and analyze and process them in combination with various sensor data, establish data models, and diagnose abnormal information in a timely manner

l Equipped with micro-meteorological data collection function. By collecting on-site temperature, humidity, wind speed, wind direction, etc., and combining them with conductor galloping data for analysis and processing

l Intelligent galloping analysis. Through the platform's 3D analysis algorithm, 3D parameters are established when the device is first installed. Based on the MATLAB algorithm, combined with sensor data and image data, a three-dimensional monitoring system is formed for the entire monitored line

l Real-time video browsing function, with a resolution ≤1080P, which can realize the monitoring of conductor galloping. Through image recognition and processing, diagnose galloping information

l Stable and reliable battery charging management system, using MPPT (Maximum Power Point Tracking) technology to charge the battery, which can increase the solar charging efficiency by at least 20%




4. Technical Parameters:

u Power supply method: wind-solar hybrid plus battery

u Communication requirements: support wireless network communication, and operators can be selected according to on-site conditions

u Working voltage: DC12V




5. Summary:

It is very necessary to install a set of Transmission Line Geological Disaster and Galloping Disaster Monitoring System on the transmission line to monitor the status of the transmission tower power system in real time online. It reminds operation and maintenance personnel to take effective protective measures in time to reduce the damage of galloping to the conductor, which helps the staff to grasp various conditions of the transmission tower at the first time, greatly reduces the cost of manual inspection, and is more practical and reliable. The TLKS-PMG-WD Transmission Line Geological Disaster and Galloping Disaster Monitoring System online monitoring device developed by our company has been applied in many provinces, and our company has set up offices all over the country to carry out business. Welcome to consult or act as an agent, Ms. Li from Shenzhen Telike Technology Co., Ltd.

①③⑥⑧②③⑤①⑥③⑤ (WeChat synchronized)    QQ: ①⑨②0⑥⑦①⑨②⑦     Company Website: //www.sztlk.com

Customized products, the quoted price is a reference range price when the market is currently released, and the actual price is subject to negotiation.




6. Precautions:

1. Pay attention to avoiding the device from falling on the ground or being subjected to strong impact from other objects;

2. Pay attention to avoiding strong external impact on the solar panel, which may cause damage to the solar panel;

3. When installing, try to make the solar panel face the sun direction;

4. When installing the device, turn off the power switch, and turn on the power switch after the installation is completed;

5. It is strictly forbidden to disassemble the structure or circuit board without permission. Unauthorized disassembly of the device will void the warranty.

Industry Category Instruments & Meters/Measurement Standards/Electromagnetic Metrology Standards
Product Category
Brand: 特力康
Spec: TLKS-PMG-WD
Stock: 999
Manufacturer: 深圳市特力康科技有限公司
Origin: 114403
About Toocle.com -  Toocle Partnership -  Toocle Services -  Toocle Agents
Copyright © Toocle.com. All Rights Reserved.
(浙)-经营性-2023-0192
ChatGlobal TChat