YCS-7000 Integrated Monitoring System for Building Equipment with Unified Power and Weak Current Systems
Contact Info
- Add:陕西省西安市翠华路60号, Zip:
- Contact: 刘品宜
- Tel:13572979371
- Email:243616989@qq.com
Other Products
YCS-7000 Integrated Building Equipment Monitoring System
1.System Overview
The YCS-7000 Integrated Building Equipment Monitoring System, in accordance with the requirements of Section 18.14 of the GB 51348-2019 "Standard for Electrical Design of Civil Buildings," achieves building equipment monitoring, power monitoring, lighting control, residual current monitoring, energy metering, building environment monitoring, energy efficiency management, and other building monitoring and management functions. The system includes equipment for the distribution, conversion, protection, control, metering, and safety of electrical energy, as well as monitoring, metering, control, and protection functions for the controlled equipment. It also features human-machine control operations, information and status display, and network communication capabilities. The system interconnects building equipment control systems via a network to form a comprehensive, integrated power supply, monitoring, and control system.
2. System Features
Integration of Strong and Weak Currents
Building equipment control integrates energy efficiency tracking, secondary circuits, and BA control.
Unified Equipment Control
Building equipment adopts one-to-one control, with consistent wiring and programming, facilitating construction, debugging, and operation management.
Integration of Communication and Wiring
All building equipment control systems use a single communication bus, unifying cables and communication protocols, making wiring and debugging easier.
High System Reliability and Stability
Controllers are highly standardized and undergo strict quality assurance. Each controller failure only affects a single building device, ensuring high system reliability.
Low Project Cost
Comprehensive reduction in material costs, construction costs, debugging service costs, platform software costs, and long-term operation and maintenance costs.
3. System Diagram
Yachuan Projects:
Nanchang Zhongwei Commercial, Shanghai Songjiang District Stadium, Yangtze River Poyang Lake Aquatic Life Protection Base, Yueyang Free Trade Zone Digital Economy Industrial Complex Construction Project, Fengxian Hospital Medical Technology Complex Building, Ankang Traditional Chinese Medicine Hospital, Lugu Seventh Primary School, Lugu Fifth Primary School, Weifang High-Speed Rail New Area Development Project, Qishan Hospital, Zhengzhou Xinyueyuan, Zhengzhou China-Europe Railway Express Assembly and Dispatch Command Center, Wuwei Leitai Scenic Area, Xi'an International Port Area 2017 Shantytown Renovation Phase I Resettlement Housing Project, Qishan County Outpatient Building, Jinfangyuan Wanda Plaza, Wuxi World Internet of Things Conference Permanent Venue, Lanzhou City Shuguang Rail Transit, Xinjiang Karamay Houbo College Relocation Phase II Project
For detailed information and solutions, please contact the responsible person: Manager Liu - 135 7297 9371 (same as WeChat ID)
| Industry Category | Measurement-Analysis-Instruments |
|---|---|
| Product Category | |
| Brand: | |
| Spec: | YCS-7000 |
| Stock: | |
| Origin: | China / Shaanxi / Xianshi |