Looking for Jiangxi Zhiguang for turnkey installation of transformers in Dayu.
Other Products
I. Company Profile:
Jiangxi Zhiguang Electric Co., Ltd., located in the Longnan Economic Development Zone, Ganzhou, Jiangxi Province, is a wholly-owned subsidiary of Guangdong Ziguang Electric Co., Ltd. Leveraging Ziguang's years of experience in power engineering, Jiangxi Zhiguang Electric undertakes long-term projects including the installation of 12kV and below substation and distribution systems, electrical equipment installation, transformer capacity expansion/new installations, and more. Its business covers power engineering installation in Ganzhou, transformer capacity expansion, transformer installation projects, etc. The company has extensive construction experience and case studies across various industries such as factory power supply, municipal power engineering, real estate, schools, and hotels. Jiangxi Zhiguang Electric also independently produces dry-type transformers, oil-immersed transformers, fully insulated gas-insulated switchgear, medium-voltage switchgear, semi-insulated ring main units, low-voltage distribution cabinets, box-type substations, distribution boxes, and other equipment. It is a Ganzhou-based power engineering company that integrates power engineering installation with the manufacturing of high and low-voltage power equipment.
Business Scope:
1. Installation of 10/0.4kV substation and distribution projects, transformer capacity expansion, new transformer installations, and temporary power supply project installation. This includes turnkey projects from connecting to the grid's 10kV high-voltage side to the user side, converting power to 0.4kV via transformers, covering electrical design for distribution rooms, installation of high and low-voltage power equipment, maintenance projects, etc.
2. Electrical equipment modification, preventive testing of electrical equipment, and electrical equipment maintenance services.
3. Production and sales of electrical equipment.
II. Power Engineering Construction:
Jiangxi Zhiguang Electric Co., Ltd. has extensive experience in power engineering construction in Ganzhou, undertaking long-term projects such as transformer capacity expansion, installation of high and low-voltage distribution projects, power engineering construction, transformer installation projects, and temporary power supply projects. It is a one-stop supplier for power engineering and distribution equipment. Projects cover the entire process from power distribution design, power application to meter installation and power connection, including all materials, equipment, and construction, with labor, materials, and power connection all included. Jiangxi Zhiguang Electric holds a Grade III qualification certificate for power engineering general contracting issued by the construction department, as well as Grade V qualification certificates for installation, repair, and testing. It also holds a construction safety production license. The company regularly undertakes power distribution projects for factories, enterprises, schools, hotels, municipal power supply, and other industries.
Construction Scope:
Ziguang Power Engineering's service areas include:
Dongguan (Guancheng Street, Nancheng Street, Dongcheng Street, Wanjiang Street); 28 towns (Shilong Town, Shipai Town, Chashan Town, Qishi Town, Qiaotou Town, Dongkeng Town, Hengli Town, Changping Town, Humen Town, Changan Town, Shatian Town, Houjie Town, Liaobu Town, Dalingshan Town, Dalang Town, Huangjiang Town, Zhangmutou Town, Xiegang Town, Tangxia Town, Qingxi Town, Fenggang Town, Machong Town, Zhongtang Town, Gaobu Town, Shijie Town, Wangniudun Town, Hongmei Town, Daojiao Town)
Jiangxi Ganzhou (Longnan City, Zhanggong District, Nankang City, Ruijin City, Gan County, Xinfeng County, Dayu County, Shangyou County, Chongyi County, Anyuan County, Dingnan County, Quannan County, Xingguo County, Ningdu County, Yudu County, Huichang County, Xunwu County, Shicheng County)
Guangdong Qingyuan
III. Power Engineering Cases:
10kV Substation and Distribution Project for Ji'an Juntu Technology Co., Ltd.
Power Distribution Project for Longnan Lingde Industrial Co., Ltd.
Power Distribution Project for Longnan Huaxing Mining Co., Ltd.
Capacity Expansion and Renovation Project for Longnan No. 3 Middle School
Power Distribution Project for Ji'an Juntu Technology Co., Ltd.
Power Distribution Project for Longnan Lingde Industrial Co., Ltd.
Power Distribution Project for Longnan Zhongli Real Estate Development Co., Ltd.
Power Distribution Project for Longnan Grain Reserve Center
Power Distribution Project for Jiangxi Hongban Technology Co., Ltd.
Power Distribution Project for Longnan Jiahe Xintiandi
Installation of One Box-Type Substation for Jiangxi Huihong Environmental Protection Equipment Co., Ltd.
Jiangxi Keyao Electromechanical - Lot 2 (Low-Voltage Distribution Section)
Power Distribution Project for Longnan Dongjin Environmental Technology Co., Ltd.
Basement Power Distribution Project for Bomei Jiuyang Phase II
Power Distribution Project for Ganzhou Qianjiu Liquor Co., Ltd.
Installation of One 1250kVA Transformer for Quannan Hongchang
Power Distribution Project for Ping'anyi · Longnan Hakka Folk Culture Experience Base
Power Distribution Project for Jiangxi Sixing Intelligent Equipment Manufacturing Co., Ltd.
Power Distribution Project for Jiangxi Keyao Electromechanical - Lot 2 (Low-Voltage Distribution Section)
2000kVA Substation and Distribution Project for Jiangxi Huimai
Power Distribution Project for Jiangxi Hongban Technology Co., Ltd.
Power Distribution Project for Jiangxi Guangzhen Photosensitive Materials Co., Ltd. (Lot 3)
Substation and Distribution Project for Jiangxi Zongsheng Electronics Co., Ltd.
IV. Construction Flowchart:
1. Submit power application to the power supply department
2. Power supply enterprise approves the application and issues a power supply plan (10 working days for single power source, 18 working days for dual power source)
3. Commission a qualified power installation company for design and construction
4. Design power distribution plan and submit for review
5. Power supply company reviews and approves the power distribution plan (20 working days)
6. Civil engineering and grounding grid construction
7. Equipment delivery, installation, and debugging
8. Cable and cable tray connection
9. Handover testing
10. Final acceptance inspection (7 working days)
11. Sign power supply and usage contract
12. Meter installation and power connection (20 working days)
Note:Red text indicates steps completed by the power userBlue text indicates steps completed by the power supply party
| Industry Category | Electrical-Equipment-Supplies |
|---|---|
| Product Category | |
| Brand: | 智光电气 |
| Spec: | scb14 |
| Stock: | 10 |
| Manufacturer: | |
| Origin: | China / Jiangxi / Ganzhoushi |