A Comprehensive Compilation of Parameters for Emergency Rescue Temporary Embankments
Contact Info
- Add:Zhongshan East Road, Chang'an District, Shijiazhuang City, Hebei Province, Zip: 050032
- Contact: 刘女士
- Tel:0311-86033093
- Email:1906778434@qq.com
Other Products
Emergency Rescue and抢险 Emergency Sub-dike Usage Specifications and Parameter Compendium of Sub-dikes
Emergency Rescue and抢险 Emergency Sub-dike Usage Specifications and Parameter Compendium of Sub-dikes
☆ Flood Control Sub-dike ☆ Installation Personnel ☆编组
On-site construction personnel编组 refers to the编组 of personnel required for actual layout, assembly, inspection and verification when it is expected that the sub-dike equipment has been transported to the operation site. Usually, one company (about 120 people) is deployed per kilometer, and one platoon (about 30 people) is deployed per 250 meters as a relatively independent operation team (when operating on soil foundation conditions, 100 more people can be added for excavating anti-seepage trenches). Each platoon is divided into several operation teams, and its specific personnel composition and task division are: .
1 The company commander (中队长) and platoon leader (分队长) are responsible for the organization and command of the medium (sub-) team. .
2 Surveying and mapping, acceptance team: 1 team leader; 2 surveying and mapping and technical inspectors. It is mainly responsible for surveying and mapping the axis of the sub-dike, determining the position of slotting (soft foundation) or punching (hard foundation), and inspecting and accepting the construction quality of the sub-dike.
.3 Slotting (punching) team: 1 team leader, several slotting (punching) operators. For soft foundation (earth dike) applications, this team is mainly responsible for opening anti-seepage and anti-displacement trenches on the dike top; for hard foundation applications, this team is mainly responsible for punching, placing and fastening expansion bolts or ramming spikes.
.4 Dam body assembly team: 1 team leader, several operators. It is mainly responsible for assembling the rigid dam body. It can also work jointly with the water-retaining and anti-seepage team.
.5 Water-retaining and anti-seepage team: 1 team leader, several operators. It is mainly responsible for burying water-retaining and anti-seepage fabrics. It can also work jointly with the dam body assembly team.
Hebei Wuxing Electric Power Equipment Co., Ltd. adheres to the business philosophy of "Kindness, Sincerity, Wisdom and Diligence"
Genuine and good value: Provide customers with trustworthy products and fair prices.
Be honest and transparent: Treat all customers who have business dealings with Hebei Wuxing Electric Power Equipment Co., Ltd. with honesty and fairness.
| Industry Category | Others |
|---|---|
| Product Category | |
| Brand: | 冀虹 |
| Spec: | WX |
| Manufacturer: | 河北五星电力设备有限公司 |
| Origin: | 111301 |