Main technical specifications of the secondary dike
Contact Info
- Add:Zhongshan East Road, Chang'an District, Shijiazhuang City, Hebei Province, Zip: 050032
- Contact: 刘女士
- Tel:0311-86033093
- Email:1906778434@qq.com
Other Products
Main Technical Specifications of Auxiliary Levee Professional Customized Auxiliary Levee by Manufacturers
Main Technical Specifications of Auxiliary Levee Professional Customized Auxiliary Levee by Manufacturers
AssembledFloodControl Auxiliary Levee +Foldable Flood Control Auxiliary Levee + Plate Dam Flood Control Auxiliary Levee + Combined Flood Control Auxiliary Levee - Portable Flood Control Auxiliary Levee +Flood Control Auxiliary Levee(Waterproof Auxiliary Levee, Flood Control Auxiliary Levee)Installation Personnel Grouping
On-site construction personnel grouping refers to the grouping of personnel required for actual layout, assembly, inspection and verification based on the assumption that the auxiliary levee equipment has been transported to the operation site.
Usually, one company (about 120 people) is deployed per kilometer, and one platoon (about 30 people) is deployed per 250 meters as a relatively independent operation team. When operating under soil foundation conditions, an additional 100 people can be added to dig anti-seepage trenches. Each platoon is divided into several operation teams, and the specific personnel composition and task division are as follows:
1 The company commander (squadron leader) and platoon leader (sub-team leader) are responsible for the organization and command of the squadron (sub-team).
2 Surveying and mapping, acceptance team: 1 team leader; 2 surveying and mapping, technical inspectors. It is mainly responsible for surveying and marking the axis of the auxiliary levee, determining the position of the trench (soft foundation) or drilling (hard foundation), and inspecting and accepting the construction quality of the auxiliary levee.
3 Trenching (drilling) team: 1 team leader, several trenching (drilling) operators. When applied to soft foundations (earth levees), this team is mainly responsible for opening seepage interception and anti-displacement trenches on the levee top; when applied to hard foundations, this team is mainly responsible for drilling, placing and tightening expansion bolts or ramming spikes.
4 Dam body assembly team: 1 team leader, several operators. It is mainly responsible for assembling the rigid dam body. It can also work jointly with the water blocking and seepage prevention team.
5 Water blocking and seepage prevention team: 1 team leader, several operators. It is mainly responsible for burying water blocking and seepage prevention cloth. It can also work jointly with the dam body assembly team.
Assembled Flood Control Auxiliary Levee + Foldable Flood Control Auxiliary Levee + Plate Dam Flood Control Auxiliary Levee + Combined Flood Control Auxiliary Levee - Portable Flood Control Auxiliary Levee + Flood Control Auxiliary Levee (Waterproof Auxiliary Levee, Flood Control Auxiliary Levee)
| Industry Category | Others |
|---|---|
| Product Category | |
| Brand: | 冀虹 |
| Spec: | WX |
| Manufacturer: | 河北五星电力设备有限公司 |
| Origin: | 111301 |