Jerry's Intelligent Robot Painting System Equipment

JERRYS ROBOT


Pre-powder coating process parameters:

1. Customer's requirements for coating quality: Generally, we need to carefully analyze the overall quality of the samples or models provided by the customer.

2. Condition of the object to be coated: We need to conduct preliminary analysis on the green body that the customer will produce, such as the properties of the material and the condition of color absorption. The requirements and key points for surface treatment of the green body before coating.

3. Confirm the coating system: Analyze the surface effect of the coating based on the samples, including confirmation of the type of paint, color system, gloss, etc.

4. Must consider the customer's existing conditions: The process we design must be based on the customer's existing conditions to ensure smooth implementation in their factory (such as equipment, construction environment, personnel quality, etc.).

5. Planning of the coating process and preliminary evaluation of the coating time period.

6. Cost calculation and evaluation of the product.

Frame pre-treatment + electrophoresis process and parameters

Serial No.

Process

Time (sec)

Temperature ℃

Treatment method

Remarks

1

Loading

-

RT

Manual

Loading station: 5 meters

2

Hot water washing

60

55~65

Spray

3

Pre-degreasing

90

55~65

Spray

4

Main degreasing

180

55~65

Immersion

Equipped with ultrasonic cleaning for 150 seconds

5

Water washing 1#

60

RT

Spray

6

Water washing 2#

60

RT

Immersion

Immersion/Spray

7

Pure water washing 1#

60

RT

Spray

8

Silane/Titanate treatment

120

RT

Immersion

Phosphating design/Silane/Titanate treatment

9

Water washing 3#

40

RT

Spray

10

Water washing 4#

40

RT

Immersion

Immersion/Spray

11

Pure water washing 2#

40

RT

Spray

12

Dripping

120

RT

-

Moisturizing treatment

13

Cathodic electrophoresis

180

28±1

Immersion + out-of-tank spray

14

UF1

40

RT

Spray

15

UF2

40

RT

Immersion

Cleaning station confirmation

16

UF3

40

RT

Spray

Cleaning station confirmation

17

Fresh UF

PASS

RT

Spray

Cleaning station confirmation

18

Pure water washing 3#

40

RT

Spray

Cleaning station confirmation

19

Fresh pure water

PASS

RT

Spray

Cleaning station confirmation

20

Automatic water blowing

0.2

RT

Compressed air

21

Manual water blowing

120

RT

22

Draining section

900-1200

RT

Isolation room

23

Pre-baking

20min

120~140

Hot air circulation

Heat radiation

24

Touch-up painting

-

RT

Robot/Manual

Touch-up paint

25

Electrophoresis baking

40min (20min insulation)

160~180

Hot air circulation

Heat radiation

26

Forced cooling

8min

RT

27

Unloading/Transferring

-

RT

Manual

38

Repair

-

RT

Manual

Offline grinding and repair

Others