Customization Cycle for Industrial Blasting Rooms

Price:300000.00
Industry Category: Environment
Product Category:
Brand: 定制
Spec: 定制


Contact Info
  • Add:邹平县黛溪街道办事处前城村, Zip:
  • Contact: 杨经理
  • Tel:13505432698
  • Email:3095333932@qq.com

Other Products

Description
Additional Information

The customization cycle for industrial blast rooms, sandblasting rooms, and shot blasting rooms has no fixed standard. It is primarily influenced by three factors: equipment specifications, configuration complexity, and manufacturer capacity. The typical range is between 15 days and 3 months, which can be divided into three stages:

135 0543 2698 Yang


1. Preliminary Design and Confirmation Stage (3-7 days)

• Need to clarify requirements with the manufacturer: workpiece dimensions, surface treatment standards, site limitations, environmental requirements, etc.

• The manufacturer provides a design plan (including room structure and supporting system layout), and both parties confirm the details of the plan (such as abrasive recovery methods and dust removal specifications). This stage may take longer with increasing complexity of requirements (e.g., extra-large or special process requirements may require more than 10 days).

2. Production and Manufacturing Stage (10-45 days)

• Small and simple models (e.g., internal dimensions < 10m³, manual configuration): 10-15 days, mainly involving processing of room panels and assembly of basic components.

• Medium-sized standard models (e.g., internal dimensions 10-50m³, semi-automatic recovery + dust removal): 20-30 days, requiring customization of non-standard-sized room frames and supporting systems (such as spiral recovery machines and cartridge dust collectors).

• Large and complex models (e.g., internal dimensions > 50m³, fully automatic robotic arms + intelligent recovery): 30-45 days, involving large-scale structural welding and automation equipment debugging. Some extra-large equipment (e.g., for ship components) may require more than 2 months.

3. Installation and Acceptance Stage (5-15 days)

• Small equipment: Can be prefabricated in the factory and assembled on-site, with installation and trial operation completed in 5-7 days.

• Large/complex equipment: Requires on-site welding, pipeline installation, and system integration debugging, completed in 10-15 days. If cross-regional transportation is involved (e.g., extra-wide room components), an additional 3-5 days for transportation may be required.

In summary, the overall cycle for simple small non-standard equipment is approximately 15-25 days, medium-sized standard models about 30-50 days, and large complex models about 2-3 months. If the manufacturer's capacity is tight or special custom components (such as explosion-proof dust removal systems) are required, the cycle may be further extended.

Industry Category Environment
Product Category
Brand: 定制
Spec: 定制
Stock:
Origin: China / Shandong / Binzhoushi
About Toocle.com - Partner Programme - Old Version
Copyright © Toocle.com. All Rights Reserved.
(浙)-经营性-2023-0192