Paint bucket packer
Contact Info
- Add:深圳市龙岗区坪地街道六联社区鹅公岭工业区, Zip: 518116
- Contact: 赵永启
- Tel:0755-84550022
- Email:1010732464@qq.com
Other Products
Installation Notes
1. Place the machine on a level surface without shaking, then add approximately 60 kilograms of 68# or 46# hydraulic oil.
2. The motor of this machine is 3-phase—380V—50HZ. Please verify whether the local voltage matches the machine's requirements. After connecting the wires (wire size should correspond to the motor's power), turn on the power and check the motor's rotation direction (indicated by the arrow)—it should rotate clockwise. If the direction is incorrect, adjust the connection of any two live wires.
Maintenance
This machine should be operated and maintained by designated personnel. After each workday, turn off the main power, clean debris around the machine, and remove any foreign objects inside the machine.
Regularly check whether screws at various parts of the machine are loose. For new machines, parts prone to loosening include: the small flange screws on the central shaft and the large screws inside the pressure plate. These should be reinforced periodically.
Safety Precautions
Before starting the baling process, first check whether all doors are properly closed, whether the door lock core is fully engaged, and whether the blade clip is secured. Do not proceed with baling if any of these parts are not properly engaged to avoid accidents.
When the machine is in operation, stand beside the machine and avoid extending your head, hands, or any part of your body into the door area to prevent crushing injuries.
| Industry Category | Machinery |
|---|---|
| Product Category | |
| Brand: | |
| Spec: | |
| Stock: | |
| Origin: | China / Guangdong / Shenshi |